— Our Services
Bathroom Installation
— About This Service
Bathroom Installation
BHW Property Solutions manages bathroom projects from initial design to final handover, fitting new suites, tiling, wet rooms, underfloor heating and all plumbing connections. Gas work is carried out under Gas Safe regulations and our team hold recognised NVQs. As a small two-person team we provide personal oversight and consistent workmanship, backed by 14 years trading and TrustATrader vetting. 24/7 emergency cover gives peace of mind through and after the build.

— Our Process
How It Works
Site survey & design
On-site assessment, measurements and a practical design brief — we discuss layout, ventilation, heating and waterproofing, then produce a clear quote and timescale.
Preparation & materials
We arrange fixtures, tiles and heating components to your spec, confirm access and delivery windows, and prep walls, floors and drainage before works begin.
Installation & handover
Full installation of plumbing, tiling, electrics coordination and decoration, followed by a commissioning check, certification (where applicable) and a tidy handover.
— Benefits
Why Choose us for Bathroom Installation?
Experienced, accredited tradespeople
14 years trading with Gas Safe registration, NVQ-qualified operatives and TrustATrader vetting — you get compliant, standards-led workmanship.
Personal, consistent service
A small two-person team means direct owner involvement and the same craftspeople on site from start to finish for consistent quality.
Fast response and aftercare
24/7 emergency callouts and optional service plans mean rapid support for leaks, heating faults or post-installation issues.
Full bathroom refurbs and new installs — we supply and fit suites, showers, shower trays and wet-room installations, heat sources such as underfloor heating and heated towel rails, plus all associated pipework and drainage. We specialise in solutions for period townhouses in Northampton and modern bungalows across the county, where careful handling of soil stacks, floor heights and ventilation is essential.
Typical work we carry out:
- Complete strip-out and waste removal
- New soil pipe and drainage connections
- Tiling, bath-to-shower conversions and wet-room waterproofing
- Installation of hot water cylinders and cylinder pipework
- Radiator and towel rail installation, including TRV fitting
We act as the project lead, coordinating trusted electricians, plasterers and tilers where specialist input is required so you get a single point of contact and a tight schedule. All gas appliances and work that affects gas systems are completed under our Gas Safe accreditation and finished installs come with the appropriate handover paperwork. With 14 years' experience and NVQ-qualified operatives, we focus on durable details — correct falls, tanking, inlet valves and commissioning — so the bathroom performs for years.
Prefer a phased approach or a bespoke design? We offer practical advice on materials, water-saving fittings and accessibility adaptations, plus optional post-install service plans and 24/7 emergency support if anything goes wrong after completion.
— FAQ
Frequently Asked Questions
Typical full bathroom refurbs take 7–14 working days depending on complexity, tile work and any structural changes. Simpler replacements or suites without structural works can be done in 3–5 days. We give a firm timescale at survey and keep to the agreed schedule wherever possible.
Book a free on-site survey
— Other Services
